Flatiron West, Inc In Search of Certified DBEs, Subcontractors and Suppliers

By sbdceditor,

Request for Certified DBEs, Subcontractors and Suppliers

Project: Interstate 215 at Scott Road Interchange Improvements (Project No. B3-0689)

Owner: Riverside County Transportation Department

Bid Submittal Date: April 27, 2018 at 11:00 a.m.

Flatiron West, Inc. (“Flatiron”) requests quotes from Certified DBE Firms, Subcontractors and Suppliers for the following, but not limited to, scopes of work for the Interstate 215 at Scott Road Interchange Improvements Project.

Request for quotes from Certified DBEs, Subcontractors and Suppliers for the following, but not limited to scopes of work: Request for Certified DBE Subcontractors & Suppliers. Quotes requested for, but not limited to: AC Dike, Aggregate Supply, Anti-Graffiti, Asphalt Paving, Bridge Demo, CIDH, Clear & Grub, Cold Plane AC, Concrete Barrier, Concrete Supply, Construction Area Signs, Electrical, Erosion Control, Fence, Formliners, Guardrail, Hydroseed, Joint Seal, Landscape & Irrigation, Manhole, Metal Railing, Minor Concrete, Miscellaneous Iron and Steel, Noise Monitoring, Pipe Supply, Pre-Stressing, Reinforcing Steel, Roadside Signs, Rock Slope Protection, Street Sweeping, Striping.

Bidding documents are available for download, at no cost, through our procurement system, iSqFt. To receive access to the documents, please send an email request to [email protected]. Plans and specifications are also available from the Riverside County Transportation Department website at https://rctlma.org/trans/Contractors-Corner/Notices-Inviting-Bids. Additionally, plans and specifications are available at Flatiron’s San Marcos, CA and Chino Hills, CA offices. Please call to make an appointment to view plans and specifications.

This project has an 11% DBE Goal. In addition to request for participation from Certified DBE subcontractors and suppliers, Flatiron requests non-DBE subcontractors to provide lower-tier DBE subcontractor and/or supplier participation. Bidders are required to indicate lower-tier DBE participation as it will be evaluated as part of their quote.

Flatiron analyzes and considers each DBE quote, including those that are broken down into economically feasible units to facilitate bidding. Assistance in obtaining bonding, lines of credit, insurance, equipment, supplies and materials is available upon request. Additionally, please contact us if you require technical assistance. Quotations must be valid for same duration as specified by Owner for contract award (120 calendar days).

Subcontractors are required to possess and maintain a current contractor’s license and must also be registered with the Department of Industrial Relations (DIR) as required by Public Contract Code Section 1725.5. Subcontractors will be required to execute Flatiron’s Standard Subcontract Terms and Conditions and insurance requirements. A copy of our Standard Subcontract Terms and Conditions is available in electronic format upon request.

Bond Requirements: Notwithstanding any contrary language in a bid to Flatiron or any prior course of dealing between Flatiron and a bidder, and unless waived in writing by Flatiron, Flatiron reserves the right to require each bidder to provide payment and performance bonds assuring bidder’s obligations to Flatiron in the amount of 100 percent of the bid to Flatiron. Flatiron will reimburse the bond premium at actual cost not to exceed 3%. The surety on the bonds must be a California admitted surety.
Flatiron West, Inc.

1770 La Costa Meadows Drive, San Marcos, CA 92078
Phone (909) 597-8413 / FAX (909) 597-8635
Point of Contact: Veronica Garcia, Estimating Administrator
([email protected])

WE ARE AN EQUAL OPPORTUNITY  EMPLOYER

Leave a Reply

Your email address will not be published. Required fields are marked *